Standard purification plants are not suitable for these kinds of loads. This is why the additional sewage must be stored.
For objects with short maximum loads, for example weekend operations in gastronomy
Completely plug-in
The overload storage can be combined with the purification plants AQUA-SIMPLEXpionier and AQUA-SIMPLEXregulant
The purification plant purifies the normal wastewater quantity.
Only the additional sewage is stored in the overload storage during the maximum load. In the period of minimum load it is transported back into the purification plant. Biology offers optimal, regular conditions for the treatment of sewage, in order to reach excellent purification results.
Standard purification plants are not suitable for these kinds of loads. This is why the additional sewage must be stored. How does it work?
Every drop of sewage is initially transported into the buffer basin and then it is measured to the size of the purification plant! Like this the sewage is pumped - this is at least 95% too much and it costs a lot of money. This is not the case with the Kordes overload storage! Here only the sewage, which cannot momentarily be purified by the purification plant, is transported into the storage. Only when the primary treatment tank is full, the inflowing sewage flows into the overload storage. As far as the primary treatment tank is able to take in the sewage again, the pump of the overload storage fills it in. This process is repeated until the overload storage is completely empty.
Here you can see a theoretical representation of how maximum overloads, which are transported to the overload storage, build up in gastronomy on certain days. In the course of the week the overload storage empties according to the respective low load.
Convenient sewage treatment equipment.






Range of Sewage treatment systems up to 50 pe.
AQUA-SIMPLEX - The perfect solution for service fitting and new construction.

.
.






Situation: normal load (purification plant for 10 pe.)
Overload storage is not operating.
Situation: maximal load (purification plant for 10 pe.)
Overload storage fills up.
Situation: underload (purification plant for 10 pe.)
The overload storage empties.